WEKO3
アイテム
災害発生後の認定こども園の保育継続における課題 : 令和5年梅雨前線による大雨及び台風2号により被災した茨城県取手市の認定こども園の事例から
https://tokushima-u.repo.nii.ac.jp/records/2012376
https://tokushima-u.repo.nii.ac.jp/records/20123769ab05d81-ae7e-4068-82cf-741abef35ebb
名前 / ファイル | ライセンス | アクション |
---|---|---|
![]()
Download is available from 2026/11/30.
|
|
Item type | 文献 / Documents(1) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
公開日 | 2024-12-13 | |||||||||||
アクセス権 | ||||||||||||
アクセス権 | embargoed access | |||||||||||
資源タイプ | ||||||||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||||||||
資源タイプ | journal article | |||||||||||
出版タイプ | ||||||||||||
出版タイプ | VoR | |||||||||||
出版タイプResource | http://purl.org/coar/version/c_970fb48d4fbd8a85 | |||||||||||
タイトル | ||||||||||||
タイトル | 災害発生後の認定こども園の保育継続における課題 : 令和5年梅雨前線による大雨及び台風2号により被災した茨城県取手市の認定こども園の事例から | |||||||||||
言語 | ja | |||||||||||
タイトル別表記 | ||||||||||||
その他のタイトル | CHALLENGES IN CONTINUING TO PROVIDE CHILDCARE IN AN ACCREDITED CERTIFIED CHILD CENTER AFTER A DISASTER : A CASE STUDY OF AN ACCREDITED CERTIFIED CHILD CENTER IN TORIDE CITY, IBARAKI PREFECTURE, JAPAN, DAMAGED BY HEAVY RAINFALL CAUSED BY A RAIN FRONT AND TYPHOON NO. 2 IN 2023 | |||||||||||
言語 | en | |||||||||||
著者 |
西村, 実穂
× 西村, 実穂
× 中野, 晋 |
|||||||||||
抄録 | ||||||||||||
内容記述タイプ | Abstract | |||||||||||
内容記述 | 本研究では,令和5年梅雨前線による大雨及び台風2号により被災した茨城県取手市の認定こども園を事例として,認定こども園における保育継続計画策定時の留意点を整理することを目的として周辺地域の内外水氾濫解析および被災園,自治体保育担当課,受け入れ先となった幼稚園・保育所を対象とした保育継続に関するインタビュー調査を実施した.内外水氾濫解析の結果,I-1園の浸水過程の特徴が明らかになり,早期の避難の必要性と避難が長時間に及ぶ場合の備えの必要性があることが示された.被災園は,代替施設を確保して3ヶ所での分散保育を行っていたが,代替施設確保が課題となっており,子どもの受け入れを可能とする代替施設を用意できるよう地域内での連携体制づくりが求められる. | |||||||||||
言語 | ja | |||||||||||
抄録 | ||||||||||||
内容記述タイプ | Abstract | |||||||||||
内容記述 | The purpose of this study is to summarize the points to be considered when formulating a child-care continuity plan for certified child-care centers, using a certified child center in Toride City, Ibaraki Prefecture, which was damaged by a heavy rain caused by a rainy front and Typhoon No. 2 in 2023, as a case study. Interviews were conducted with the affected certified child center, the local government division in charge of childcare, and three kindergarten and daycare centers that had accepted the children. The affected preschools had secured alternative facilities and dispersed their childcare services among the three locations. When childcare was resumed, priority was given to children with high childcare needs, and even within the same certified child center, some children were able to resume attending certified child center early while others were not, depending on the working status of their parents. In addition, securing an alternative facility to accommodate many children is an issue, and a cooperative system within the community is needed to enable the acceptance of children. | |||||||||||
言語 | en | |||||||||||
キーワード | ||||||||||||
言語 | en | |||||||||||
主題Scheme | Other | |||||||||||
主題 | heavy rain disaster | |||||||||||
キーワード | ||||||||||||
言語 | en | |||||||||||
主題Scheme | Other | |||||||||||
主題 | nursery school | |||||||||||
キーワード | ||||||||||||
言語 | en | |||||||||||
主題Scheme | Other | |||||||||||
主題 | certified child centers | |||||||||||
キーワード | ||||||||||||
言語 | en | |||||||||||
主題Scheme | Other | |||||||||||
主題 | childcare continuity | |||||||||||
書誌情報 |
ja : 土木学会論文集 en : Japanese Journal of JSCE 巻 80, 号 24, p. 24-24007, 発行日 2024 |
|||||||||||
収録物ID | ||||||||||||
収録物識別子タイプ | ISSN | |||||||||||
収録物識別子 | 24366021 | |||||||||||
出版者 | ||||||||||||
出版者 | 土木学会 | |||||||||||
言語 | ja | |||||||||||
権利情報 | ||||||||||||
言語 | ja | |||||||||||
権利情報 | © 2024 公益社団法人 土木学会 | |||||||||||
EID | ||||||||||||
識別子 | 415421 | |||||||||||
識別子タイプ | URI | |||||||||||
言語 | ||||||||||||
言語 | jpn |