平成30年7月豪雨被災事例からみる水道施設における浸水被害時の初動対応と事業継続についての考察
https://tokushima-u.repo.nii.ac.jp/records/2009941
https://tokushima-u.repo.nii.ac.jp/records/200994168162baf-78e7-4535-a079-60833e8e1c82
名前 / ファイル | ライセンス | アクション |
---|---|---|
![]() |
|
Item type | 文献 / Documents(1) | |||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
公開日 | 2022-05-25 | |||||||||||||||||||||||||||||
アクセス権 | ||||||||||||||||||||||||||||||
アクセス権 | open access | |||||||||||||||||||||||||||||
資源タイプ | ||||||||||||||||||||||||||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||||||||||||||||||||||||||
資源タイプ | journal article | |||||||||||||||||||||||||||||
出版社版DOI | ||||||||||||||||||||||||||||||
識別子タイプ | DOI | |||||||||||||||||||||||||||||
関連識別子 | https://doi.org/10.2208/jscejsp.76.2_I_219 | |||||||||||||||||||||||||||||
言語 | ja | |||||||||||||||||||||||||||||
関連名称 | 10.2208/jscejsp.76.2_I_219 | |||||||||||||||||||||||||||||
出版タイプ | ||||||||||||||||||||||||||||||
出版タイプ | VoR | |||||||||||||||||||||||||||||
出版タイプResource | http://purl.org/coar/version/c_970fb48d4fbd8a85 | |||||||||||||||||||||||||||||
タイトル | ||||||||||||||||||||||||||||||
タイトル | 平成30年7月豪雨被災事例からみる水道施設における浸水被害時の初動対応と事業継続についての考察 | |||||||||||||||||||||||||||||
言語 | ja | |||||||||||||||||||||||||||||
タイトル別表記 | ||||||||||||||||||||||||||||||
その他のタイトル | INITIAL RESPONSE AND BUSINESS CONTINUITY IN THE EVENT OF FLOOD DAMAGE AT WATER SUPPLY FACILITY : CONSIDERATION FROM DISASTER CASES OF WATER SUPPLY FACILITIES CAUSED BY THE HEAVY RAIN EVENT OF JULY 2018 | |||||||||||||||||||||||||||||
言語 | en | |||||||||||||||||||||||||||||
著者 |
湯浅, 恭史
× 湯浅, 恭史
WEKO
636
× 石田, 勇貴
× 中野, 晋
WEKO
17
× 蒋, 景彩
WEKO
23
|
|||||||||||||||||||||||||||||
抄録 | ||||||||||||||||||||||||||||||
内容記述タイプ | Abstract | |||||||||||||||||||||||||||||
内容記述 | 平成30年7月豪雨では河川氾濫などにより,水道施設に深刻な浸水被害や土砂災害が発生し,周辺地域が長期に断水するケースがあった.水道事業は被災地域の生活に必要なライフラインであることから,給水車などで応急給水を行うが,本格的な水道施設の復旧は地域の復旧に欠かせないものである.また,地域の企業や医療機関などの復旧や事業継続にも不可欠であることから,水道施設の浸水リスク等への事業継続対応は,早期の復旧・復興を考える上で大きな課題となる. 本研究では,豪雨災害で浸水被害等のあった水道施設に対し,初動対応から復旧再開までの対応についてヒアリング調査等を実施し,水道施設の被害からの速やかな水道供給と復旧を実現する上で,事業継続の観点から必要な対応や要素について検討を行った.初動対応時から復旧再開に至るまでの目標復旧時間を明確にした上で,複数の事業継続戦略を用いた対応が必要となる.そのために取り組むべき対応や考え方について提言する. |
|||||||||||||||||||||||||||||
言語 | ja | |||||||||||||||||||||||||||||
抄録 | ||||||||||||||||||||||||||||||
内容記述タイプ | Abstract | |||||||||||||||||||||||||||||
内容記述 | The heavy rain event of July 2018 caused several severe flood disasters and landslide disasters. Some water supply facilities were damaged and the water supply was interrupted. Since water supply became difficult at water facilities, they received support from other facilities and responded to temporary facilities. We conducted interview surveys on the affected water supply facilities and summarized the way of initial response and the business continuity in the event of inundated damage. In the event of flood damage or landslide damage, the procedure from the initial response to the resumption of recovery was organized, and proactive measures for achieving early recovery were proposed. |
|||||||||||||||||||||||||||||
言語 | en | |||||||||||||||||||||||||||||
キーワード | ||||||||||||||||||||||||||||||
言語 | en | |||||||||||||||||||||||||||||
主題Scheme | Other | |||||||||||||||||||||||||||||
主題 | water supply facility | |||||||||||||||||||||||||||||
キーワード | ||||||||||||||||||||||||||||||
言語 | en | |||||||||||||||||||||||||||||
主題Scheme | Other | |||||||||||||||||||||||||||||
主題 | flood damage | |||||||||||||||||||||||||||||
キーワード | ||||||||||||||||||||||||||||||
言語 | en | |||||||||||||||||||||||||||||
主題Scheme | Other | |||||||||||||||||||||||||||||
主題 | initial response | |||||||||||||||||||||||||||||
キーワード | ||||||||||||||||||||||||||||||
言語 | en | |||||||||||||||||||||||||||||
主題Scheme | Other | |||||||||||||||||||||||||||||
主題 | business continuity | |||||||||||||||||||||||||||||
キーワード | ||||||||||||||||||||||||||||||
言語 | en | |||||||||||||||||||||||||||||
主題Scheme | Other | |||||||||||||||||||||||||||||
主題 | heavy rainfall | |||||||||||||||||||||||||||||
書誌情報 |
ja : 土木学会論文集F6(安全問題) en : Journal of Japan Society of Civil Engineers, Ser. F6 (Safety Problem) 巻 76, 号 2, p. I_219-I_227, 発行日 2020 |
|||||||||||||||||||||||||||||
収録物ID | ||||||||||||||||||||||||||||||
収録物識別子タイプ | ISSN | |||||||||||||||||||||||||||||
収録物識別子 | 21856621 | |||||||||||||||||||||||||||||
出版者 | ||||||||||||||||||||||||||||||
出版者 | 土木学会 | |||||||||||||||||||||||||||||
言語 | ja | |||||||||||||||||||||||||||||
権利情報 | ||||||||||||||||||||||||||||||
言語 | ja | |||||||||||||||||||||||||||||
権利情報 | © 2020 公益社団法人 土木学会 | |||||||||||||||||||||||||||||
EID | ||||||||||||||||||||||||||||||
識別子 | 373658 | |||||||||||||||||||||||||||||
識別子タイプ | URI | |||||||||||||||||||||||||||||
言語 | ||||||||||||||||||||||||||||||
言語 | jpn |